🕒 Created

Bristol City Council plans to repair Pero's Bridge after its central span collapsed into the harbour.

The Bristol City Council is preparing a specialist recovery operation for Pero's Bridge, which partially fell into the water on October 31. Preliminary engineering assessments indicate that a failure within the hydraulic lifting system was the most likely source of an initial mechanical issue two months prior to the collapse. A council report revealed that three tonnes of 'love locks' attached to the structure prevented proper testing for nearly a decade until they were removed in August 2025. The administration announced it will spend approximately £1.5m on refurbishing the bridge, with an additional £280,000 allocated for recovery and transport to Albion Dry Dock. The council aims to complete repairs before summer 2027. While some officials attributed the collapse to external vibrations from music or traffic, others noted that decades of under-investment contributed to the current state of the city's infrastructure. The bridge was originally built in 1999 and named after Pero Jones, an enslaved African who lived in Bristol during the 18th century. The council is currently using £95,000 for temporary fenders to stabilize the structure while it awaits dismantling.

Sources